8th Ave S Sidewalk Improvements
Updated: September 7, 2020
This project is complete!
8th Ave S now has new sidewalks on both sides of 8th Ave S between S Sullivan St and S Southern St.
SDOT crews extended the street designs next to the South Park Library up 8th Ave S.
Curb bulb art on 8th Ave S and S Sullivan St
"Papel Picado" crosswalk on 8th and Cloverdale
Project Overview
We built new sidewalks on 8th Ave S between S Sullivan St and S Southern St in South Park in 2020. This included a new sidewalk on the east side of the street where a temporary in-street walkway was installed in 2016 and a replacement of the existing sidewalk on the west side.
The SDOT design team worked closely with our SDOT Urban Forestry team and was able to preserve the beautiful street trees on both sides of the street. The sidewalk now meets current Americans with Disabilities Act (ADA) standards, making it easier and safer for people of all ages and abilities to walk to destinations like the South Park Community Center, South Park Library, and bus stops.
From a project neighbor: I have lived and operated a small child care on the corner of 8th Ave S and S Southern St for many years. The old sidewalks were in such bad shape that the preschool children and I would avoid using them because they often had standing water and the bumps and cracks made it difficult to push the stroller. Our new sidewalks are flat, dry & beautiful! Our little preschool group loved watching the construction. The cement trucks were definitely crowd pleasers. AND the beautiful new corner art is like the icing on the cake. Now everyone can see, what we in the neighborhood already knew, South Park is a very special and beautiful place. -Shawna Murphy
DECORATIVE STREET DESIGNS ON 8TH AVE S
Based on positive feedback about the decorative crosswalks and street designs on 8th Ave S and S Cloverdale St, we extended similar art up 8th Ave S between S Cloverdale and S Southern streets. See this fact sheet for details and please contact us with questions.
Yard signs:
Background
Over several years the existing sidewalk was harmed because of growing tree roots damaging the pavement. Based on feedback from neighbors, we made efforts to save the trees while preserving parking and maintaining access for people walking. To accomplish those goals we created a temporary walkway and were later able to secure funding to construct a permanent sidewalk and replace the sidewalk on the west side of the street as well.
Existing temporary walkway that we'll make into a permanent sidewalk with this project
Project Area
New/replaced sidewalks on both sides of 8th Ave S in South Park between S Southern St and S Sullivan St.
Schedule
2018-2019: Design and outreach (including door-to door, project 'walk and talk,' and attending community meetings)
June-August 2020: Sidewalk construction
December 2020: Installed decorative street designs
August 2021: Installed decorative "papel picado" crosswalk on north leg of 8th and Cloverdale
Community Outreach
Date | Description |
August 2020 | Posted yard signs about art |
Summer 2020 | Regular listserv email updates |
June 2020 | Mailer to project neighbors |
February 19, 2019 | Project info at South Park Street Projects Open House |
September 12, 2018 | 8th Ave S Sidewalk Improvements Walk-through |
July 30, 2018 | Door-to-door to adjacent neighbors on 8th Ave S |
Early summer, 2018 | Presentations to various community groups |
Funding
This project is funded by the 9-year Levy to Move Seattle. We selected this project for funding because it scored highly on the Pedestrian Master Plan, which aims to improve safety along the walking routes to schools and transit.
Materials
- Construction Mailer (June 2020)
- Construction Notice (December 2019)
- Fact sheet - English (2019)
- Fact sheet - Spanish (2019)
Need translation?
If you need this information translated, please call (206) 257-2201.
如果您需要此信息翻譯成中文 請致電 (206) 257-2201.
Kung kailangan mo ang impormasyon na ito na nakasalin sa Tagalog mangyari lamang na tumawag sa (206) 257-2201.
Si necesita traducir esta información al español, llame al (206) 257-2201.
Odeeffannoon kun akka siif (206) 257-2201.
Nếu quý vị cần thông tin này chuyển ngữ sang tiếng Việt xin gọi (206) 257-2201.
የዚህን መረጃ ትርጉም ከፈለጉ፣ በዚህ ስልክ ቁጥር ይደውሉ፡ (206) 257-2201.
ናይዚ ሓበሬታ ትርጉም እንተደሊኹም፣ በዚ ቁጽሪ ስልኪ ይድውሉ፡ (206) 257-2201.
당신이 번역이 정보를 필요로하는 경우에, (206) 257-2201 로 전화 해주십시오.