Boiler & Pressure Vessel Code
See also: Boiler & Pressure Vessel Inspections
The effective date for the 2021 Seattle codes is November 15, 2024. Until then, applicants may use either the 2018 or draft 2021 Seattle codes. Please visit the 2021 Seattle Code Adoption webpage for updates.
What Is It?
Our Boiler and Pressure Vessel Code has requirements for inspecting boilers pressure vessels.
Read The Code
- 2024 Seattle Boiler and Pressure Vessel Code
- 2020 Seattle Boiler and Pressure Vessel Code (with errata)
- 2017 Seattle Boiler and Pressure Vessel Code
Proposed Changes
We are updating the Seattle boiler code to the 2024 editions. See the 2021 Seattle Code Adoption page for more information.