Unreinforced Masonry Buildings - Project Documents
Project Documents
List of Unreinforced Masonry Buildings
- Updated Confirmed URM List (September 2024)
-
- Data.Seattle.Gov Updated Confirmed URM List (September 2024). To view as a map, select the globe icon on the top of the page.
- Procedure to Challenge URM Building Designation
URM Retrofit Technical Information
- URM Retrofit Technical Standard (June 2023)
- Slides and Recording from the June 12, 2023 public meeting on the draft URM Retrofit Technical Standard.
-
Materials on the development of this standard can be found on the Background page under the header “URM Retrofit Technical Standard Development.”
Technical Engineering Resources
- URM Pre-Submittal Conference Seismic Retrofit Questionnaire. If you are trying to qualify your URM building for the Alternate Method, fill out this form and bring it with you to the pre-Submittal Conference.
- Construction Pre-Submittal Conference Application.
- Use this form to schedule a Construction Pre-Submittal Conference. Under “Application Type” Be sure to select both “Construction only Pre-Submittal Conference” and “Unreinforced masonry (URM) building.”
Available Funding Resources
- See our Does the City have funding to assist owners with the retrofit of URM buildings FAQ for detailed information about the following funding resources
Financial Resources in Development:
- Proposed transfer of development rights program for URMs
- Meeting notes and opportunities to engage in this conversation can be found on the SDCI URMS Background page, under the heading Funding Working Group.
- Seattle is interested in creating a URM retrofit reimbursement program similar to a successful program implemented in Berkeley, California.
- Seattle is coordinating with the Washington Emergency Management Division and the state’s Seismic Safety Subcommittee to explore additional statewide funding incentives to support URM retrofits