Cheasty Mountain Bike/Pedestrian Trail Pilot Project
Updated: January 16, 2025
Early 2025
View the trail map here.
Construction Update
The North Loop Trail has reached substantial completion! The multi-use trail and hiking trails are open to pedestrians, but the mountain bike loop sustained damage during the recent wind events and is not open for riding until it is safe. Volunteers and Evergreen Mountain Bike Alliance crews will complete damage repairs and continue with the finishing touches on the trail, so please be aware of others when using the new trails and follow all posted signage. If you want to help maintain the trails, please consider volunteering with the regular maintenance parties at the South Loop and North Loop: www.evergreenmtb.org/calendar/work-parties.
A grand opening event is being planned for physical completion in the spring of 2025.
The project was split into two phases; phase one is the south loop with construction complete in the fall of 2023 and phase two is the north loop with construction ongoing, estimated to be completed in spring, 2025. Seattle Parks and Recreation (SPR) will be monitoring the trail usage and impacts during the three-year pilot.
SPR, Friends of Cheasty Greenspace at Mountain View, Evergreen Mountain Bike Alliance, and the Seattle Parks Foundation (SPF) thank the community for their input throughout this project
This community-initiated project is creating Seattle’s first forested mountain biking trails. Led by the Friends of Cheasty Greenspace at Mountain View and built under the guidance of Evergreen Mountain Bike Alliance, the trails offer new opportunities for families and neighbors to access nature through our urban park greenspaces.
The Cheasty Mountain Bike and Pedestrian Trail Pilot project is a public-private partnership funded by State and local grants, the City of Seattle, and the Seattle Parks Foundation. The project provides recreational opportunities for families and neighbors to access nature through our urban park greenspaces.
Volunteers Needed
Volunteers are an important part of the trail construction effort. For more information on volunteer opportunities contact Evergreen Mountain Bike Alliance: David Fleischhauer, davidfleischhauer@evergreenmtb.org, or www.evergreenmtb.org/calendar/work-parties.
Volunteer opportunities to help with the ongoing forest restoration activities are also available through the Green Seattle Partnership.
Location
Cheasty Natural Area, Cheasty Blvd S & S Della St, 98144
Budget
$571,000 - Funding sources include: the Seattle Department of Neighborhoods Grant, Seattle Park District, and community donations through the Seattle Parks Foundation (Please visit Donate to Cheasty Trails and Bike Park to contribute through the Seattle Parks Foundation.)
Schedule
Construction Phase 1: May 2021 - Late Spring 2023
Construction Phase 2: Spring 2024 - Late Spring 2025
Project
The idea of a bike trail was first suggested by community members almost a decade ago. What started as a desire to provide more recreational opportunities as well as deeper connections with community and nature, became what we now refer to as the Cheasty Mountain Bike and Pedestrian Trail Pilot Project.
The proposal is a bicycle and pedestrian loop trail system. There would be limited grading and no significant trees are proposed for removal. There are identified Environmental Critical Areas (ECAs) located within the site. It is also worth noting that the proposed trail alignment has been reconfigured from the 2015 proposal: the new alignment further avoids the wetland complex and steep slopes. This is not a permanent use, but rather a pilot project. It is not being rolled out within all of our greenspaces: this particular proposal is only occurring within Cheasty. This three-year pilot will commence once the mountain bike trails are open. During that time, SPR will conduct an evaluation, which includes monitoring the trails and assessing impacts to wetlands, erosion control, habitat disturbance, and parking impacts. After the conclusion of the pilot period, SPR will decide if they will continue to allow mountain bikes on the trails within Cheasty Greenspace.
Background
Almost a decade ago, the Friends of Cheasty Greenspace at Mountain View, along with other stakeholders had an idea. They wanted to build community and provide more access and opportunities to an underused green space. Through many conversations, community grants and hundreds of volunteer hours, that idea gained traction when Seattle Parks and Recreation began examining the feasibility. The result was the proposed bicycle and pedestrian trail pilot project within Cheasty Greenspace, which is located in southeast Seattle at Cheasty Blvd. S and S. Della St.
This project entails bicycle and pedestrian trails within Cheasty, that will provide additional opportunities for families and neighbors to access nature through our urban park greenspaces. The proposal is quite intentional and has been designed to minimize environmental impacts by utilizing best management practices for protecting wetlands and enhancing the stability of the steep slopes. SPR feels this is a win-win situation, creating opportunity and expanding accessibility while being mindful of the importance of our green spaces.
In 2015, SPR studied the potential environmental impacts of the Cheasty Mountain Bike/Pedestrian Trail Pilot Project and found there were no significant environmental impacts and issued a Determination of Non-Significance (DNS). That decision was appealed to the City of Seattle's Hearing Examiner. On Jan. 26, 2016, the Hearing Examiner found that there was insufficient information for SPR to issue a DNS at this time and that more information and study are needed about wetland impacts including drainage/hydrologic impacts as they relate to wetlands, impacts to trees including through compaction and altered hydrology and any associated impacts to wildlife habitat.
In 2017, the City's Survey Crews completed the surveying groundwork and mapping of the proposed trail alignment. Environmental consultants completed the seasonal wetland evaluation and re-evaluated the trail alignment, including the trail's buffer areas, with special emphasis on issues that were raised by the Hearing Examiner related to environmental impacts. The result of this work is an updated proposal that has been reconfigured from the 2015 version: the modified trail alignment further avoids the wetland complex and steep slopes. SPR has evaluated the impacts of the proposal as it relates to these limited areas of the environment and feels confident the project can move forward. A Determination of Non-Significance was issued on October 15, 2018. The appeal period ran through November 5 and the public comment period was open through November 13, 2018.
Community Participation
Process
The beginnings of the Cheasty Mountain Bike and Pedestrian Trail go back to at least 2013. SPR has worked closely with both internal and external stakeholders. Some highlights of the conversation include:
- The issue of Bicycle Use policy and/or the Cheasty Mountain Bike/Pedestrian Trail was before the Board of Park Commissioners at least four times, between 2013 and 2015.
- The Seattle Board of Park Commissioners held a public hearing on the Cheasty Mountain Bike/Pedestrian Trail Pilot Project on April 9, 2015.
- SPR convened a Project Advisory Team (PAT) for the Cheasty Mountain Bike/Pedestrian Trail Pilot Project, which included a five-month public process.
- Robust community outreach, two site tours and input from a Landscape Architect, Geotechnical Engineer and Environmental Consultant.
- Hundreds of public comments and input throughout the process helped shape and ultimately improve the proposed project.
Documents
Monitoring Period Reports
Year 1 Monitoring Reports
Year 2 Monitoring Reports
May 2023
North Loop SEPA DNS
April 2023
North Loop SEPA Checklist and Attachments
- SEPA Environmental Checklist Document
- North Loop Trail Design
- GeoTech Report
- Critical Areas Study And Conceptual Migitation Plan
- Inadvertent Discovery Plan
- Upper Luther Burbank Park Bike Skills Area Assessment
2022
2018
- Cheasty Bike Trail Pilot - Project Update Info Sheet
- SEPA Determination of Non-Significance (DNS)
- SEPA Checklist
- Cheasty Critical Areas Study and Conceptual Mitigation Plan
- Cheasty Critical Areas Study and Conceptual Mitigation Plan, Appendix
- Geotechnical Engineering Report 1
- Geotechnical Engineering Report 2, Appendix
- Cheasty Trails Map - Technical rendering
- Cheasty Bike Trail Arborist Report
2017
- Wetland Delineation and Trail Design - Aerial View of Wetlands
- Geo Hazards - Aerial view of geologic hazard areas
2016
- Project Area Vicinity Map
- Inadvertent Discovery Plan - Trail Pilot Project
- Hearing Examiner's decision
2015
2014
Zipped Files
- Community Communications Documents (ZIP File)
(File includes but is not limited to: 2014 FAQ sheet, Bicycle Use Policy, 2014-2015 Outreach, 2014 Cheasty Project Advisory Team notes) - SEPA Documents (ZIP File)
(File includes but is not limited to: 2015 analysis and decision of SPR, 2015 Determination of Non-Significance, 2014 schematic design, SEPA checklist) - Environmental Documents
(Jan 2014) Draft consultant agreement, (Nov 2014) Draft scope proposal, (Jan 2015) Wetland Reconnaissance and Wildlife Habitat Assessment - Environmental Documents
(Nov 2013) Inventory snapshot, Monitoring criteria and evaluation checklist, 2013 Wildlife Survey - Maps/Drawings/Charts
(Nov 2014) Preliminary schematics designs, slope map, GSP management zones and forest values, design process - Technical Reports
(March 2015) Cheasty Schematic Design at Mountainview - Technical Reports - January 2014 (Geotechnical engineering investigation), November 2014 (Preliminary Geotechnical Evaluation, Wetland Reconnaissance and Wildlife Habitat Assessment)
- Board of Park Commissioners Agendas and Minutes related to this project - October, November 2013, January 2014 & April 2015
- Project Advisory Team and Community Outreach documents - 2014-2015