Seattle Parks and Recreation (SPR) will begin renovation construction on the Bitter Lake Comfort Station/Restroom on Monday, June 12. SPR and contractor, L.W. Sundstrom, will work to minimize the construction impact of the comfort station on the remainder of the park. SPR scheduled the comfort station renovation portion of this project first prior to the play area project to allow the community to use the play area and wading pool through the summer. We anticipate completion of the comfort station and play area by the end of 2023.
Thank you to everyone who has participated in the public process. Seattle Parks and Recreation appreciates the community's participation in designing the new play area for Bitter Lake. The design team from Hoshide Wanzer Architects and Berger Partnership incorporated community input into a preferred schematic design and gathered additional feedback on the swings, spinners, and multi-generational fitness and sensory equipment at the park on September 18, 2021 and collected additional feedback in the September 2021 online survey. See the design rendering here.
This project will replace the play area equipment and renovate the existing comfort station (restroom) with the goal of bringing these amenities up to current safety and accessibility standards. Accessibility for all is a value of Seattle Parks and Recreation. The comfort station renovation will likely include individually accessed, all-gender toilet facilities, and the play area will include new play equipment that is accessible to children of all abilities. In addition, the project will make other site accessibility improvements that meet the standards from the Americans with Disabilities Act (ADA).
Location
Bitter Lake Playfield, 13035 Linden Ave N, 98133
Budget
Current budget includes $1,520,000 of REET 1 funding for planning, design and construction.
Schedule
Planning: Fall 2020
Design Permitting & Bidding: Fall 2021 - Fall 2022
Construction: 2023
Project Description
This project will replace the play area equipment and renovate the existing comfort station (restroom) with the goal of bringing these amenities up to current safety and accessibility standards. Accessibility for all is a value of Seattle Parks and Recreation. The comfort station renovation will likely include individually accessed, all-gender toilet facilities, and the play area will include new play equipment that is accessible to children of all abilities. In addition, the project will make other site accessibility improvements that meet the standards from the Americans with Disabilities Act (ADA).
During construction the contractor will need to close this portion of the park. Seattle Parks and Recreation and the contractor hired for the project will work to minimize impact to the neighborhood.
Community Participation
Seattle Parks and Recreation thanks everyone who participated in the December 2020 play area survey.
See survey results here
Seattle Parks and Recreation thanks everyone who participated in the summer 2021 second play area survey.
See survey results here
Seattle Parks and Recreation thanks everyone who participated in the September 2021 online survey and the third public meeting in the park on September 18, 2021.
Feedback results from both events are combined here
See the Schematic Design presented here
Online Open House 2/9/2021
Online Open House 7/15/2021